{"id":4801,"date":"2020-06-02T16:58:50","date_gmt":"2020-06-02T20:58:50","guid":{"rendered":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/?post_type=digest&#038;p=4801"},"modified":"2020-06-02T16:58:50","modified_gmt":"2020-06-02T20:58:50","slug":"new-copper-roof-being-made-with-traditional-methods","status":"publish","type":"digest","link":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/dnews\/new-copper-roof-being-made-with-traditional-methods\/","title":{"rendered":"New copper roof being made with traditional methods"},"content":{"rendered":"<p>The scaffolding is now up for a big renovation job on the E Wing (the back west wing on the original motherhouse near the parking lot entrance).<\/p>\n<p>\u201cWe are putting on a new copper roof using traditional methods,\u201d explained V\u00e9ronique Paris, Coordinator of Building Services.<\/p>\n<p>The project costs almost $1.65 million and took two years to plan. V\u00e9ronique explained that the project had to be approved by the <em>Direction g\u00e9n\u00e9rale du patrimoine<\/em> of the <em>Minist\u00e8re de la Culture et des Communications<\/em>.<\/p>\n<p>\u201cThe heritage experts insisted that we use traditional methods to conserve this knowledge and craftsmanship,\u201d V\u00e9ronique said. \u201cBy having this work done, we are conserving it.\u201d<\/p>\n<p>A team of up to 10 people are working on the roof through the spring, summer and fall. Some craftsmen will use the sheet-to-baguette roofing technique. The work is expected to be completed by early October.<\/p>\n<p>The current roof is original and was built in 1954 when the Congr\u00e9gation de Notre-Dame sisters had an addition built on the E Wing. The new roof should last 50-75 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The scaffolding is now up for a big renovation job on the E Wing (the back west wing on the original motherhouse near the parking lot entrance). \u201cWe are putting on a new copper roof using traditional methods,\u201d explained V\u00e9ronique Paris, Coordinator of Building Services. The project costs almost $1.65 million and took two years&#8230;<\/p>\n","protected":false},"featured_media":4802,"menu_order":149,"template":"","digest_categories":[212],"_links":{"self":[{"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/digest\/4801"}],"collection":[{"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/digest"}],"about":[{"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/types\/digest"}],"version-history":[{"count":1,"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/digest\/4801\/revisions"}],"predecessor-version":[{"id":4803,"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/digest\/4801\/revisions\/4803"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/media\/4802"}],"wp:attachment":[{"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/media?parent=4801"}],"wp:term":[{"taxonomy":"digest_categories","embeddable":true,"href":"https:\/\/www-chris.dawsoncollege.qc.ca\/news\/wp-json\/wp\/v2\/digest_categories?post=4801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}